Summary This presentation will discuss the common issues related to aging campus infrastructure, evaluation of system performance, life cycle cost analysis of various solutions, and implementation of a viable solution for the University of Wyoming's heating and cooling infrastructure. Solution...
4A.2_Koller_Selmer.pdf
Summary Canada is committed to reducing GHG emissions. In Ottawa, the $2.6B (CAD) modernization of the DES connected to over 80 buildings, including the iconic Parliament Buildings, has begun. This talk will focus on the steps taken to plan the system expansion and the challenges faced along...
4A.1_Smetny-Sowa_Manson.pdf
Summary In an effort to develop an improved and resilient utility infrastructure, the University of Florida faced a number of crucial decisions. Addressing deferred maintenance, meeting future campus growth, partnership with a private utility and evaluating funding and phasing options were all...
1E.1_McFadden_Fox.pdf
Summary A case study and review of operational improvements at Texas Tech that yielded significant energy savings ($2.06M) form optimizing the performance through continuous detailed monitoring and engineering oversight. Track 1D: Plant & System Optimization Speakers Ken Scheepers,...
1D.1_Moore_Scheepers.pdf
Summary System expansion using the university’s electrical and mechanical system within an active data center to provide power and cooling for the supercomputer. The electrical upgrade included high efficiency transformers, busways and associated electrical components for liquid cooled server...
1C.2_Tousson_Ontiveros.pdf
Summary Iowa State University developed a need to increase chilled water capacity on their west campus. This project installed a pair of a new 24-inch chilled water mains on the western portion of the campus under Bissell Road. By maintaining a utility master plan, ISU was able to leverage...
TD.1B.3_Strabala_Murray.pdf
Summary With growth looming and a CHW system near its firm capacity, DU quickly needed to develop a strategy to expand its system while minimizing costly distribution work across their iconic campus. These limits led the engineering team to consider a new approach when charting the campus’...
TD.1B.2_Bailey_Easton.pdf
Session: Thermal Distribution Workshop Speaker Michael Schorsch, Lansing Board of Water and Light #ConferenceProceeding #CampusEnergyConference #2020 #ThermalDistribution #Workshop #SystemUpgrade
TD.1.3_Schorsch.pdf
Ashley Dwy, Northern Star Summary With a budget of $3.7 million, the University aims to either improve or repair the critical electrical infrastructure that keeps the campus functioning. The next six years have the potential to be a significant improvement for facility investments in...
Andrew Sasser, The Dartmouth Summary As students walk across the Green over the next few days, they may notice another fenced-off, ongoing campus project. Earlier this week, the College commenced drilling wells on the Green to learn more about the viability of a geoexchange system at the...
1800 West Park Drive, Suite 350
Westborough, MA 01581 USA
Phone +1 (508) 366-9339
Fax +1 (508) 366-0019
© 2019 International District Energy Association, All Rights Reserved. Site by eConverse Media